5 came, 5 saw, 5 cleaned up!
Those who made it out to the August Missions Day might have noticed a cleaner, friendlier ready area. Komissar, Kalish, Laura, Peter, and Kattiana showed up to do some old fashioned manual labor.
We cleaned the check in area of props.
We picked up and organized the check in booth!
And we added a much needed retaining wall to the gear area, along with getting rid of a rotten stump.
Also built was another retaining wall, and a planter around a small oak tree in the gear area.
Do YOU want input on what is built on the field? Then check the events area for the next build day, sign up and BE THERE!!!
Tags:
© 2024 Created by Komissar. Powered by